How to read a garage conversion proposal in Brevard County
Garage conversion bids vary because each contractor imagines a different finished room. This guide shows how to turn several proposals into one comparison, so you can see what each includes. For the factors that move a price, see the cost page.
Describe the finished room first
Before you collect bids, write down what the room will be: bedroom, office, suite. Include what stays in the garage, such as the water heater, and what you plan to rent or not. A written description gives every bidder the same starting point.
Build a table of lines
Put each contractor in a column and write “not mentioned” where a proposal is silent. Blanks are the finding.
- Plans, survey and engineering.
- Permit fees and inspections.
- Slab work and floor finish.
- Door opening infill and exterior finish.
- Windows and the escape opening.
- Insulation, drywall and paint.
- Electrical and the panel.
- Cooling and ventilation.
- Plumbing, if a bath or kitchenette is planned.
- Disposal and cleanup.
Allowances and exclusions
Allowances stand in for selections not yet made, such as flooring or fixtures. A low allowance makes a bid look cheaper. Exclusions, such as painting or flooring, shift cost to you. Ask every bidder to list both, then compare them.
Trades and licenses
Florida requires the contractor’s license number on proposals, and a general, building or residential contractor must subcontract electrical, plumbing and mechanical work unless certified. Ask for each trade by name and verify every number on the state DBPR site.
Payment stages and change orders
Tie payments to stages such as framing, rough-in inspection and completion. Require change orders in writing before extra work begins, with the cost and schedule effect listed. Keep copies of everything.
Ask what happens when something is found
Slabs and panels in older garages can hide problems. Ask how each contractor would handle a cracked slab, moisture or inadequate wiring, and how the price would change. The answer shows how carefully they looked.
Using the table
Once complete, ask each contractor to explain the largest differences. Often a proposal changes when you ask it to include a missing item, which shows the first number covered less. Use the table to ask for the same assumptions from every bidder, not only to find the lowest total. Keep the table with your records.
Questions to ask in writing
Ask each contractor to confirm in writing who pulls the permit, who schedules inspections, how weather delays are handled, how long the warranty lasts and what it covers. Ask also for the work hours and for the name of the person who will supervise the crew each day.
Pricing a garage conversion
A conversion bid for your project should separate framing, slab and insulation work, electrical and HVAC, finishes and permit fees. How conversion bids work. Ask what the bid assumes about the slab, the door opening and how the new floor will meet the house. A conversion that does not describe these items may leave expensive decisions open. Ask also who removes the garage door and track, whether the water heater or laundry must move, and how the cost changes if the slab needs repair before the new floor goes in.
From garage to living space: the sequence
- Decide how the room will be used and what the garage holds now.
- Compare itemized proposals covering framing, slab, insulation, electrical and HVAC.
- Confirm the permit type for living space and any association or flood-zone rules.
- Plan the door opening, flooring transition and parking alternatives.
- Pass inspections, then keep the permit and final approval together.
Vet the converting contractor
Look up the contractor’s state license on the DBPR site and get a certificate of insurance before you sign for this kind of project. Ask whether the plan is permitted as living space (Residential Addition permit) and how ADU and flood rules apply to your parcel. See the full vetting list. Ask how the project will be permitted as living space and who coordinates the electrical, HVAC and insulation. Written answers prevent surprises at inspection. Ask too who will be on site each day, how the crew will protect the house during demolition and what warranty covers the floor, the infilled wall and the cooling system.
Garage conversion questions
How do I compare garage conversion bids?
Write down what the finished room should be, then put each proposal in a table by line: slab, door infill, windows, insulation, electrical, cooling, plumbing, permits and cleanup. Mark what is missing and ask each bidder to price the same scope.
What is an allowance?
A placeholder amount for a selection not yet made, such as flooring or fixtures. If real choices cost more, the price rises. Ask each contractor what allowances they used and compare them with showroom prices. A low allowance can make a proposal look cheaper than it really is.
How do I verify a contractor?
Search the license number or name on the state DBPR site and confirm it is active and suited to the work. Florida requires the number on proposals, and the permit should be in the contractor’s name. Then confirm the insurance certificate is current before any deposit.
What should a payment schedule look like?
A deposit followed by payments tied to stages, such as framing, rough-in inspection and completion. Avoid paying ahead of completed work, and keep copies of the contract and every change order. A request for a large payment before work starts is a reason to ask questions before you sign.
Conversion types in this guide
Reference pages:Brevard County Residential Addition permits (includes converting non-living space to living space) (accessed Nov 2026); Florida Statutes 553.79 (permits and exemptions) (accessed Nov 2026); Florida Statutes 489.113 (contractor scope and subcontracting) (accessed Nov 2026); Florida Statutes 489.119 (contractor license number in proposals) (accessed Nov 2026). General information, not legal advice; confirm with the office that covers your address.
Reviewed November 2026.